Works on the installation of gantries over the carriageway continue on the A4 motorway, as part of the implementation of the new electronic toll collection system. The activities are being carried out on the section between the Goričan, Čakovec and Ludbreg interchanges. Goričan, Čakovec i Ludbreg.
The installation of gantries includes the assembly of structures and associated technological equipment, which will form an integral part of the future contactless vehicle detection system. The works are being carried out in planned phases, with adjustments made to on-site conditions and the pace of construction.
This section is one of several locations where the infrastructure required for the new toll collection system is being built in parallel, enabling a more modern, simpler, and more efficient use of motorways.
Hrvatske Autoceste continue activities across the entire network, and the public will be regularly informed about further progress and key phases in the implementation of the CROLIBERTAS system.